{"id":56744,"date":"2024-06-29T00:04:20","date_gmt":"2024-06-29T00:04:20","guid":{"rendered":"https:\/\/english.saigonbiz.com.vn\/2024\/06\/29\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/"},"modified":"2024-06-29T00:04:20","modified_gmt":"2024-06-29T00:04:20","slug":"stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels","status":"publish","type":"post","link":"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/","title":{"rendered":"Stena RoRo places order for two new multi-fuel E-Flexer RoPax vessels"},"content":{"rendered":"<div>\n<p><span class=\"xn-location\">GOTHENBURG, Sweden<\/span>, <span class=\"xn-chron\">June 29, 2024<\/span> \/PRNewswire\/ &#8212; <b><span class=\"xn-person\">Stena RoRo<\/span> has ordered another two E-Flexer RoPax vessels from the Chinese shipyard CMI Jinling (Weihai). The vessels will be delivered in 2027 to the Greek shipping company Attica Group and will operate in the Adriatic Sea. This is <span class=\"xn-person\">Stena RoRo&#8217;s<\/span> fourteenth and fifteenth vessel in the E-Flexer series.<\/b><\/p>\n<p>The two vessels will be on long-term charter agreements to the Attica Group with an option to purchase and a potential option for two more vessels.<\/p>\n<p><b>The\u00a0E-Flexer series <\/b>is based on a concept with larger vessels than today&#8217;s standard RoPax ferries and is very flexible. Each ship is tailored to the customers&#8217; needs, both commercially and technically. Optimized design of the hull, propellers and rudders, together with possibilities to incorporate new environmentally friendly technologies, help to ensure that the E-Flexer vessels are at the forefront when it comes to sustainability, performance and cost effectiveness.<\/p>\n<p>The vessels&#8217; engines are of the multi-fuel type and can run on conventional marine fuel (HFO or MGO) or biodiesel. In addition, the engines are methanol ready. The E-Flexer concept has been designed in line with future environmental requirements and, through its technical design, can meet both existing and future international requirements by a wide margin. The vessels will be designed with the classification society notation &#8220;Battery power&#8221; which means that in the future the vessels will also be able to utilize batteries as a means of propulsion, partly or completely, depending on the battery development.<\/p>\n<p><span class=\"xn-person\">Panos Dikaios<\/span>, CEO, Attica Group commented:<br \/>&#8220;For three decades, the Attica Group has been renewed through the design and construction of new vessels. The Superfast series redefined the\u00a0Adriatic\u00a0ferry market in terms of quality and speed, the sister vessels Blue Star Patmos and Blue Star Delos significantly upgraded the travel experience on the Aegean Sea routes and the latest addition, the three state-of-the-art Aero Highspeed, have already contributed substantially to the increase of visitors to the Saronic Islands. Our agreement with <span class=\"xn-person\">Stena RoRo<\/span> for the charter of two new state-of-the-art vessels, sets new standards for the entire Greek ferry industry. It drastically reduces our environmental footprint, redefines the travel experience and responds dynamically to the challenges of tomorrow.&#8221;\u00a0<\/p>\n<p>Per\u00a0Westling, VD Stena RoRo stated:<br \/>&#8220;The E-Flexer vessels to Attica have been jointly designed and ordered as the most bespoke E-Flexers so far. The design is extremely versatile, and the ships will, with their inherent flexibility of different fuels, battery hybrid operation and many other fuel saving features, play an important role in the green transition of the Attica Superfast Adriatic RoPax service.&#8221;<\/p>\n<p><span class=\"xn-person\">Stena RoRo<\/span> currently has 15 confirmed orders for E-Flexer vessels, as well as two so-called &#8220;New Max&#8221; RoRo vessels, at CMI Jinling, Weihai shipyard. Ten ships have been delivered.<\/p>\n<p><b>Specification of\u00a0Stena E-Flexer orders: <\/b><\/p>\n<p>1.\u00a0 <span class=\"xn-person\">Stena Line<\/span>: <span class=\"xn-person\">Stena Line<\/span> network in the Irish Sea; delivery 2019<\/p>\n<p>2.\u00a0 <span class=\"xn-person\">Stena Line<\/span>: <span class=\"xn-person\">Stena Line<\/span> network in the Irish Sea; delivery 2020<\/p>\n<p>3.\u00a0 <span class=\"xn-person\">Brittany Ferries<\/span>: <span class=\"xn-person\">Brittany Ferries<\/span> network; delivery 2020<br \/>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Long charter agreement<\/p>\n<p>4.\u00a0 <span class=\"xn-person\">Stena Line<\/span>: <span class=\"xn-person\">Stena Line<\/span> network in the Irish Sea; delivery 2021<\/p>\n<p>5.\u00a0 DFDS; DFDS network; delivery 2021 <br \/>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Long-term charter agreement<\/p>\n<p>6.\u00a0 <span class=\"xn-person\">Brittany Ferries<\/span>: <span class=\"xn-person\">Brittany Ferries<\/span> network; delivery 2021<br \/>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Long-term charter agreement; LNG operation<\/p>\n<p>7.\u00a0 <span class=\"xn-person\">Stena Line<\/span>; <span class=\"xn-person\">Stena Line<\/span> network, delivery <span class=\"xn-chron\">May 2022<\/span> from the shipyard<br \/>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Extended version<\/p>\n<p>8.\u00a0 <span class=\"xn-person\">Stena Line<\/span>; <span class=\"xn-person\">Stena Line<\/span> network, delivery <span class=\"xn-chron\">September 2022<\/span> from the shipyard<br \/>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Extended version<\/p>\n<p>9.\u00a0 <span class=\"xn-person\">Brittany Ferries<\/span>: <span class=\"xn-person\">Brittany Ferries<\/span> network; delivery <span class=\"xn-chron\">December 2022<\/span><br \/>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Long-term charter agreement; LNG operation<\/p>\n<p>10.\u00a0 Marine Atlantic; Marine Atlantic network, delivery <span class=\"xn-chron\">February 2024<\/span><br \/>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Long charter agreement; LNG operation with battery-hybrid installation<\/p>\n<p>11.\u00a0 <span class=\"xn-person\">Brittany Ferries<\/span>: <span class=\"xn-person\">Brittany Ferries<\/span> network, delivery 2024<br \/>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Long charter agreement; LNG operation with battery-hybrid installation<\/p>\n<p>12.\u00a0 <span class=\"xn-person\">Brittany Ferries<\/span>: <span class=\"xn-person\">Brittany Ferries<\/span> network, delivery 2025<br \/>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Long charter agreement; LNG operation with battery-hybrid installation<\/p>\n<p>13.\u00a0 Corsica Linea, Corsica Linea network, delivery 2026<br \/>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 LNG operation with battery-hybrid installation<\/p>\n<p>14.\u00a0 Attica Group, delivery <span class=\"xn-chron\">April 2027<\/span><br \/>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Methanol ready, battery-hybrid installation<\/p>\n<p>15.\u00a0 Attica Group, delivery <span class=\"xn-chron\">August 2027<\/span><br \/>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Methanol ready, battery-hybrid installation<\/p>\n<p><b>About E-flexer No. 14 and 15:<\/b><br \/>Length: <span class=\"xn-money\">240 m<\/span><br \/>Draught: <span class=\"xn-money\">6.4 m<\/span><br \/>Beam: <span class=\"xn-money\">27.8 m<\/span><br \/>Capacity: 1500 passengers and 3320 cargo meters freight<br \/>Passenger cabins: 256<br \/>Speed: 24 knots<\/p>\n<p><b>Rendering by Peter Mild.<\/b><\/p>\n<p><b>For more information, please contact:<\/b><br \/><span class=\"xn-person\">Per Westling<\/span>, Managing Director, Stena RoRo AB<br \/>Tel: +46 31 855154; +46\u00a0704 85 51 54<br \/>Email:\u00a0<a href=\"mailto:per.westling@stena.com\" target=\"_blank\" rel=\"nofollow noopener\">per.westling@stena.com<\/a><\/p>\n<p>Since 1977, <b><span class=\"xn-person\">Stena RoRo<\/span><\/b>\u00a0has led the development of new marine RoRo, cargo and passenger concepts. We provide custom-built vessels, as well as standardized RoRo and RoPax vessels. The company leases about fifteen vessels to operators worldwide, both other Stena companies and third parties. <span class=\"xn-person\">Stena RoRo<\/span> specializes primarily in applying its technical expertise to the design and production of new vessels and the conversion and technical operation of existing vessels for providing tailored transport solutions to its customers. We call this &#8220;Stenability&#8221;. Since 2013, we have had responsibility for the design and completion of Mercy Ships&#8217; new hospital vessel the\u00a0<i>Global Mercy<\/i>\u00a0\u2013 the world&#8217;s largest civilian hospital ship. The ship was delivered in 2021.<br \/><a href=\"https:\/\/c212.net\/c\/link\/?t=0&amp;l=en&amp;o=4202660-1&amp;h=1850467326&amp;u=https%3A%2F%2Fwww.stenaroro.com%2F&amp;a=www.stenaroro.com\" target=\"_blank\" rel=\"nofollow noopener\">www.stenaroro.com<\/a><\/p>\n<p><b>Attica Group<\/b>, with a long-standing presence in the Greek and international seas, leads the Greek passenger shipping industry and is among the largest shipping companies worldwide. Through the brands of Superfast Ferries, Blue Star Ferries, Hellenic Seaways and ANEK Lines, and with a fleet of more than 40 ships, Attica Group connects links more than 60 destinations every day, offering modern, high-level transport services in <span class=\"xn-location\">Greece<\/span> and international routes (<span class=\"xn-location\">Greece<\/span> \u2013 <span class=\"xn-location\">Italy<\/span>). The Group has also expanded its presence in the tourism sector with the acquisition of 3 hotels in Naxos (2) and Tinos (1). With a clear commitment towards integrating the principles of sustainable development into its business activity and operations, Attica Group was the first company in the passenger shipping industry worldwide to issue a Responsibility &amp; Sustainability Report in 2009, according to the GRI guide.<br \/><a href=\"https:\/\/c212.net\/c\/link\/?t=0&amp;l=en&amp;o=4202660-1&amp;h=334676328&amp;u=http%3A%2F%2Fwww.attica-group.com%2F&amp;a=www.attica-group.com\" target=\"_blank\" rel=\"nofollow noopener\">www.attica-group.com<\/a><\/p>\n<p>This information was brought to you by Cision <a href=\"https:\/\/c212.net\/c\/link\/?t=0&amp;l=en&amp;o=4202660-1&amp;h=2312010333&amp;u=http%3A%2F%2Fnews.cision.com%2F&amp;a=http%3A%2F%2Fnews.cision.com\" target=\"_blank\" rel=\"nofollow noopener\">http:\/\/news.cision.com<\/a><\/p>\n<p><a href=\"https:\/\/c212.net\/c\/link\/?t=0&amp;l=en&amp;o=4202660-1&amp;h=2186557666&amp;u=https%3A%2F%2Fnews.cision.com%2Fstena-roro%2Fr%2Fstena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels%2Cc4009034&amp;a=https%3A%2F%2Fnews.cision.com%2Fstena-roro%2Fr%2Fstena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels%2Cc4009034\" target=\"_blank\" rel=\"nofollow noopener\">https:\/\/news.cision.com\/stena-roro\/r\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels,c4009034<\/a><\/p>\n<p>The following files are available for download:<\/p>\n<div>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"1\">\n<tbody>\n<tr>\n<td class=\"prngen1\" colspan=\"1\" rowspan=\"1\">\n<p class=\"prnml4\"><span class=\"prnews_span\"><a href=\"https:\/\/c212.net\/c\/link\/?t=0&amp;l=en&amp;o=4202660-1&amp;h=633688209&amp;u=https%3A%2F%2Fmb.cision.com%2FMain%2F9515%2F4009034%2F2893575.pdf&amp;a=https%3A%2F%2Fmb.cision.com%2FMain%2F9515%2F4009034%2F2893575.pdf\" target=\"_blank\" class=\"prnews_a\" rel=\"nofollow noopener\">https:\/\/mb.cision.com\/Main\/9515\/4009034\/2893575.pdf<\/a><\/span><\/p>\n<\/td>\n<td class=\"prngen1\" colspan=\"1\" rowspan=\"1\">\n<p class=\"prnml4\"><span class=\"prnews_span\">Stena RoRo places order for two new multi-fuel E-Flexer RoPax vessels<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"prngen1\" colspan=\"1\" rowspan=\"1\">\n<p class=\"prnml4\"><span class=\"prnews_span\"><a href=\"https:\/\/c212.net\/c\/link\/?t=0&amp;l=en&amp;o=4202660-1&amp;h=3933668569&amp;u=https%3A%2F%2Fnews.cision.com%2Fstena-roro%2Fi%2Frendering-e-flexer-14-and-15%2Cc3316255&amp;a=https%3A%2F%2Fnews.cision.com%2Fstena-roro%2Fi%2Frendering-e-flexer-14-and-15%2Cc3316255\" target=\"_blank\" class=\"prnews_a\" rel=\"nofollow noopener\">https:\/\/news.cision.com\/stena-roro\/i\/rendering-e-flexer-14-and-15,c3316255<\/a><\/span><\/p>\n<\/td>\n<td class=\"prngen1\" colspan=\"1\" rowspan=\"1\">\n<p class=\"prnml4\"><span class=\"prnews_span\">Rendering E-Flexer 14 and 15<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>GOTHENBURG, Sweden, June 29, 2024 \/PRNewswire\/ &#8212; Stena RoRo has ordered another two E-Flexer RoPax vessels from the Chinese shipyard CMI Jinling (Weihai). The vessels will be delivered in 2027 to the Greek shipping company Attica Group and will operate in the Adriatic Sea. This is Stena RoRo&#8217;s fourteenth and fifteenth vessel in the E-Flexer [&#8230;]\n","protected":false},"author":1,"featured_media":79226,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-56744","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pr-newswire"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v21.6 (Yoast SEO v21.6) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Stena RoRo places order for two new multi-fuel E-Flexer RoPax vessels - Biz and Live in Saigon<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stena RoRo places order for two new multi-fuel E-Flexer RoPax vessels\" \/>\n<meta property=\"og:description\" content=\"GOTHENBURG, Sweden, June 29, 2024 \/PRNewswire\/ &#8212; Stena RoRo has ordered another two E-Flexer RoPax vessels from the Chinese shipyard CMI Jinling\" \/>\n<meta property=\"og:url\" content=\"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/\" \/>\n<meta property=\"og:site_name\" content=\"Biz and Live in Saigon\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SaigonbizGroup\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-29T00:04:20+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/#\/schema\/person\/267b348e6cf32a66aab33637c2d399a6\"},\"headline\":\"Stena RoRo places order for two new multi-fuel E-Flexer RoPax vessels\",\"datePublished\":\"2024-06-29T00:04:20+00:00\",\"dateModified\":\"2024-06-29T00:04:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/\"},\"wordCount\":981,\"publisher\":{\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/#organization\"},\"articleSection\":[\"Pr Newswire\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/\",\"url\":\"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/\",\"name\":\"Stena RoRo places order for two new multi-fuel E-Flexer RoPax vessels - Biz and Live in Saigon\",\"isPartOf\":{\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/#website\"},\"datePublished\":\"2024-06-29T00:04:20+00:00\",\"dateModified\":\"2024-06-29T00:04:20+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/english.saigonbiz.com\/vn\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Stena RoRo places order for two new multi-fuel E-Flexer RoPax vessels\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/#website\",\"url\":\"https:\/\/english.saigonbiz.com\/vn\/\",\"name\":\"Biz and Live in Saigon\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/english.saigonbiz.com\/vn\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/#organization\",\"name\":\"SaigonBiz Media\",\"url\":\"https:\/\/english.saigonbiz.com\/vn\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/english.saigonbiz.com\/vn\/wp-content\/uploads\/2026\/03\/cropped-c2adea16-1c71-4315-8801-803a8d237e2a_removalai_preview.png\",\"contentUrl\":\"https:\/\/english.saigonbiz.com\/vn\/wp-content\/uploads\/2026\/03\/cropped-c2adea16-1c71-4315-8801-803a8d237e2a_removalai_preview.png\",\"width\":512,\"height\":512,\"caption\":\"SaigonBiz Media\"},\"image\":{\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SaigonbizGroup\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/#\/schema\/person\/267b348e6cf32a66aab33637c2d399a6\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/english.saigonbiz.com\/vn\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/english.saigonbiz.com\/vn\/wp-content\/uploads\/2026\/03\/c2adea16-1c71-4315-8801-803a8d237e2a_removalai_preview-2_uwp_avatar_thumb.png\",\"contentUrl\":\"https:\/\/english.saigonbiz.com\/vn\/wp-content\/uploads\/2026\/03\/c2adea16-1c71-4315-8801-803a8d237e2a_removalai_preview-2_uwp_avatar_thumb.png\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/english.saigonbiz.com\/vn\"],\"url\":\"https:\/\/english.saigonbiz.com\/vn\/profile\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Stena RoRo places order for two new multi-fuel E-Flexer RoPax vessels - Biz and Live in Saigon","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/","og_locale":"en_US","og_type":"article","og_title":"Stena RoRo places order for two new multi-fuel E-Flexer RoPax vessels","og_description":"GOTHENBURG, Sweden, June 29, 2024 \/PRNewswire\/ &#8212; Stena RoRo has ordered another two E-Flexer RoPax vessels from the Chinese shipyard CMI Jinling","og_url":"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/","og_site_name":"Biz and Live in Saigon","article_publisher":"https:\/\/www.facebook.com\/SaigonbizGroup","article_published_time":"2024-06-29T00:04:20+00:00","author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/#article","isPartOf":{"@id":"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/"},"author":{"name":"admin","@id":"https:\/\/english.saigonbiz.com\/vn\/#\/schema\/person\/267b348e6cf32a66aab33637c2d399a6"},"headline":"Stena RoRo places order for two new multi-fuel E-Flexer RoPax vessels","datePublished":"2024-06-29T00:04:20+00:00","dateModified":"2024-06-29T00:04:20+00:00","mainEntityOfPage":{"@id":"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/"},"wordCount":981,"publisher":{"@id":"https:\/\/english.saigonbiz.com\/vn\/#organization"},"articleSection":["Pr Newswire"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/","url":"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/","name":"Stena RoRo places order for two new multi-fuel E-Flexer RoPax vessels - Biz and Live in Saigon","isPartOf":{"@id":"https:\/\/english.saigonbiz.com\/vn\/#website"},"datePublished":"2024-06-29T00:04:20+00:00","dateModified":"2024-06-29T00:04:20+00:00","breadcrumb":{"@id":"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/english.saigonbiz.com\/vn\/stena-roro-places-order-for-two-new-multi-fuel-e-flexer-ropax-vessels\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/english.saigonbiz.com\/vn\/"},{"@type":"ListItem","position":2,"name":"Stena RoRo places order for two new multi-fuel E-Flexer RoPax vessels"}]},{"@type":"WebSite","@id":"https:\/\/english.saigonbiz.com\/vn\/#website","url":"https:\/\/english.saigonbiz.com\/vn\/","name":"Biz and Live in Saigon","description":"","publisher":{"@id":"https:\/\/english.saigonbiz.com\/vn\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/english.saigonbiz.com\/vn\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/english.saigonbiz.com\/vn\/#organization","name":"SaigonBiz Media","url":"https:\/\/english.saigonbiz.com\/vn\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/english.saigonbiz.com\/vn\/#\/schema\/logo\/image\/","url":"https:\/\/english.saigonbiz.com\/vn\/wp-content\/uploads\/2026\/03\/cropped-c2adea16-1c71-4315-8801-803a8d237e2a_removalai_preview.png","contentUrl":"https:\/\/english.saigonbiz.com\/vn\/wp-content\/uploads\/2026\/03\/cropped-c2adea16-1c71-4315-8801-803a8d237e2a_removalai_preview.png","width":512,"height":512,"caption":"SaigonBiz Media"},"image":{"@id":"https:\/\/english.saigonbiz.com\/vn\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SaigonbizGroup"]},{"@type":"Person","@id":"https:\/\/english.saigonbiz.com\/vn\/#\/schema\/person\/267b348e6cf32a66aab33637c2d399a6","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/english.saigonbiz.com\/vn\/#\/schema\/person\/image\/","url":"https:\/\/english.saigonbiz.com\/vn\/wp-content\/uploads\/2026\/03\/c2adea16-1c71-4315-8801-803a8d237e2a_removalai_preview-2_uwp_avatar_thumb.png","contentUrl":"https:\/\/english.saigonbiz.com\/vn\/wp-content\/uploads\/2026\/03\/c2adea16-1c71-4315-8801-803a8d237e2a_removalai_preview-2_uwp_avatar_thumb.png","caption":"admin"},"sameAs":["https:\/\/english.saigonbiz.com\/vn"],"url":"https:\/\/english.saigonbiz.com\/vn\/profile\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/english.saigonbiz.com\/vn\/wp-json\/wp\/v2\/posts\/56744","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/english.saigonbiz.com\/vn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/english.saigonbiz.com\/vn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/english.saigonbiz.com\/vn\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/english.saigonbiz.com\/vn\/wp-json\/wp\/v2\/comments?post=56744"}],"version-history":[{"count":0,"href":"https:\/\/english.saigonbiz.com\/vn\/wp-json\/wp\/v2\/posts\/56744\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/english.saigonbiz.com\/vn\/wp-json\/wp\/v2\/media\/79226"}],"wp:attachment":[{"href":"https:\/\/english.saigonbiz.com\/vn\/wp-json\/wp\/v2\/media?parent=56744"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/english.saigonbiz.com\/vn\/wp-json\/wp\/v2\/categories?post=56744"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/english.saigonbiz.com\/vn\/wp-json\/wp\/v2\/tags?post=56744"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}